Greg Mitchell, JBER Landfill gas plant operator, checks the pressure on the landfill gas processing module, being constructed at the Anchorage Landfill, Aug. 21, 2012. The module cleans and dries the landfill gas before it is sent to the plant. (U.S. Air
Force photo/Tech. Sgt. Brian Ferguson)